Are your energy assets ready to respond to unexpected failures?

During a recent ground-fault, over 30 separate plants in Texas experienced a disruption due to the “Odessa Disturbance”. This fault led to a reduction of over 1,100 MW of solar energy.

The North American Electric Reliability Corp. (NERC) published a detailed root cause analysis Report that stated the solar industry “is not proactively identifying abnormal performance issues” to mitigate events like these. Does your company fall into this category?

Learn more about this issue: https://pv-magazine-usa.com/2021/09/24/odessa-disturbance-highlights-troubling-gaps-in-solar-reliability/